This project is located in the heart of the Hollywood district and consist of 47 new apartments and ground floor retail. Trane rooftop gas packs have been installed for corridor conditioning and building pressurization as well as future tenant improvement on ground floor. Ducting to lower level was installed in three fire rated shafts complete with fire smoke dampers. Custom louvers for range, bath and dryer vents were colored to match architectural exterior. There were many trades working in the confines of the project and we thank all of you for the communication, coordination and safety practice that made this a successful build. Mechanical build duration was 8.5 months.

 